Reconstruction Units

Reconstruction Units

A further innovation in the area of access technology are the lintel refurbishment units MFG 40-1/S:

  • These small, flexible units allow working under the cantilever, parallel to the building.
  • Their own drive makes them independent in terms of movement.
  • The small required set-up area of only 1.65 m only minimally influences the traffic flow.
  • They are ideal for work in the cantilever area, such as for pipe laying, lintel refurbishments etc.

 

The resilient refurbishment machines MBS 170-2/S and MBS 230-2,4/S are the cheapest variants for long term refurbishment of bridges:

  • The hard wearing machines have a maximum reach of between 17 and 23 m.
  • After the professional training through our operating personnel, your staff is able to operate the hydrostatically driven units on their own.
  • An advantage is the small space required (approx. 2.00 m).
  • Flexible scaffolding will help you to reach all necessary work areas.
  • Noise protection walls up to a height of 2.45 m are not a problem.

 


Contact

WEMO-tec UK Ltd.

Nottingham Commerce Centre
8 Experian Way
NG2 Business Park
Nottingham
NG2 1EP
GREAT BRITAIN

Tel.: +44 (0) 1325 28 59 73
Fax: +44 (0) 1325 28 97 96

E-Mail: info@wemo-tec.co.uk

 

WEMO-tec GmbH Germany

Buergermeister-Ebert Str. 17
36124 Eichenzell

Tel.: +49 6659 86-201
Fax: +49 6659 86-399

E-Mail: bu-geraete@wemo-tec.com


Reconstruction Units

MBS 120-2 12 7 - - 1,1 800 -
MBS 170-2/S 17 8 - - 2 12.500 -
MBS 230-2,4/S 23 7,5 - - 2,00 - 2,60 18.500 - 22.500 -
MFG 40-1/S 4 4,8 * - - 1,40 - 1,65 4.000 -
Portalgerät PG 180-6 17 8 - - - 23.000 -
* length depending on version